1.Application
This equipment is suitable for the production of spun bond nonwovens with a variety of colors and different properties using PP chips as main material mixed with master batch, anti-oxygen, anti-pilling agent and flame retardant.
2. Process flow
Additive (recycle edge)
↓
Material → melting and extruding → filtering → metering → spinning → quenching → air-flow drawing → web forming → calendaring → winding and slitting
3. Technical data
5.Why choose US
1. High standard nonwoven machine specification.
2. Free inspection invitation before delivery.
3. your order safe and your money is safe.
4. Free door to door engineering service in 24 month.
5. CE Certification and ISO:9001 management system.
FAQ:
This equipment is suitable for the production of spun bond nonwovens with a variety of colors and different properties using PP chips as main material mixed with master batch, anti-oxygen, anti-pilling agent and flame retardant.
2. Process flow
Additive (recycle edge)
↓
Material → melting and extruding → filtering → metering → spinning → quenching → air-flow drawing → web forming → calendaring → winding and slitting
3. Technical data
Raw material | Polypropylene chips (Melt index: 30-40g/10min, with variation not more than 1% for each batch; Melt point: 166ºC; Ash content: <0.15-0.25% |
Width of finished fabric | 3200mm |
Single filament titer | 1.9-2.5 denier |
Annual output | 3000 tons (say 7,200hours per year, over 60 gsm) |
Web weight | 10-200 g/m2 |
GSM Variation | CV value less than 5% |
Extruder size | φ170×30:1 |
Process speed: | 10~130m/min |
Installed power | about 400kW |
1.After Sale Service Terms:
- Installation: the Seller will despatch 4-5 engineers for installation and commission of the production line, training the Buyer's workers in the site. Normally it will take 1 month for whole installation and training.
- Cost: the Seller should cover the engineers' salary, visa cost and round air tickets. However, the Buyer should cover the accommodations, transportation, food and other related cost occurring in Buyer's country. Also, the Buyer should prepare enough labor, electric wire and cables outside of the control panel and tools for installation.
- Machine Guarantee: 2 years within 1 year free spare parts;
- Guarantee Period: 24 months after the completion of commission but not later than 28 months after the shipping (BL) date. In case any item proves to be defective and the damage is confirmed by Seller's technicians within this period, the Seller will send engineer to repair or supply a new one for replacement free of charge on the basis of CNF delivery.
- Guarantee Parts: the above items do not include the parts, which are among regular spares and easily-damaged parts from normal wear, abnormal operation, improper maintenance and inadequate civil works. The Seller will be not responsible for any production loss under any circumstances.
5.Why choose US
1. High standard nonwoven machine specification.
2. Free inspection invitation before delivery.
3. your order safe and your money is safe.
4. Free door to door engineering service in 24 month.
5. CE Certification and ISO:9001 management system.